Air Force Patch NATO APOD Kabul Multinational Force Afghanistan

Air Force Patch NATO APOD Kabul Multinational Force Afghanistan Patch 2009 Velcro Local made embroidered on twill cut edge 86mm three and three eighth inches diameter. Free shipping

Out of stock

Air Force Patch NATO APOD Kabul Multinational Force Afghanistan Patch 2009 Velcro Local made embroidered on twill cut edge 86mm three and three eighth inches diameter.

Free Shipping

The Airport Protection Overlay District APOD is a 30 facility enhanced security compound constructed for the military on the north side of Kabul Airport. Construction began in autumn 2007 completed in February 2008 opened on 1 May 2009 and with the migration of all military personnel and operations from the southern portion of the Airport completed by the end of 2009 and was the single largest wartime construction project in NATOs history.

 

This patch dates from 2009.